During the last few sprints the aim has been to develop the code for the system. However, there was a code freeze for sometime to fix some engineering-related issues. Testing, for Sprint 0 had to be done so the database could be installed. After the engineering bugs were fixed, the beginning of the database and code development process ran to schedule.
After Sprint 0, there were a couple of small fixes that need to be put in before doing any real work on the developing system in Sprint 1. The plan for the next Sprint is to develop the code further, then update the code to include the fixes, then bring the system online. If something does not work, repository backups are available to allow a roll-back.
View the rest of the second interim report here.